The building is heated and cooled via a thermally activated floor slab. Thermal energy is provided by a reversible heat pump connected to eleven geothermal probes extending to a depth of 150 m. A photovoltaic system installed on the green roof contributes to the building’s on-site electricity demand.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning
© Ingenieurplanung Söllner

© Ingenieurplanung Söllner

© Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building– Efficient heating & cooling
Mensa University Landshut
As an addition to the entrance ensemble to the university, a flat, transparent wooden building was realized that is oriented towards the campus and po...
Student residence District Living / DC Tower 3
The District Living student dormitory makes use of a small gusset site in the middle of Donau City between business buildings, the subway line and the...
Bus depot
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with ...
Multifunktionsfassade
Together with regional companies and supported by the province of Salzburg, a new type of façade system was developed in the course of the network pro...
Kliniken Südostbayern, Neubau BT 15
Due to the developments in recent years with shortening of patient stays, increasing cross-professional cooperation, expansion of possibilities in dia...
Administration in Beilngries
A new administration building for approx. 150 employees was to be constructed for Schmidt-Seeger GmbH with its Beilngries site. The building is divide...
Köln Triangle
The Köln Triangle office building is located directly on the Rhine, opposite Cologne Cathedral. The ground plan shape of the 103 meter high tower is a...
VIER WINKEL - Business house and hotel B&B
A modern concept on a traditional foundation - the business building VIER WINKEL. An interplay of different business models, unique in their appearanc...
Das Haus der sozialen Sicherheit
After a two-year renovation phase, the approximately 350 employees of the Main Association of Social Insurance Institutions were able to move back int...
Project wind heating 2.0
Wind energy now accounts for the largest share of electricity generation from renewables in Germany. However, especially during the typically windy wi...