Logistics hall
The building is heated and cooled via a thermally activated floor slab. Thermal energy is provided by a reversible heat pump connected to eleven geothermal probes extending to a depth of 150 m. A photovoltaic system installed on the green roof contributes to the building’s on-site electricity demand.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning
Ingenieurplanung Söllner

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building– Efficient heating & cooling
Green Eastside – Leben am langen Felde
In the new urban development area “Leben am langen Felde,” an ecological showcase residential building has been created, offering the highest level of...
Werner-Heisenberg-Gymnasium
Three square structures occupy building sites in the landscaped context. This creates a charming dialogue with the pavilion-like, precise buildings....
Bildungscampus Innerfavoriten
The main design approach for this large educational building in the Neues Landgut urban development area in Vienna-Favoriten is to maximize the amount...
Wagnertec
The office spaces are characterized by the wooden ceiling beams and the visible concrete ceiling, the facade by the robust masonry with window reveals...
Residential and commercial building Allersberg
Successful renovation and new construction in the middle of the marketplace. The house consists of four residential units and one commercial unit.
Th...
the mirror
The project "mirror", the freshly occupied residential high-rise in the new Reininghaus quarter, proves that good architecture, sustainability and aff...
Hohe Warte
On the former presidential grounds near the meteorological station on Hohe Warte, five residential buildings have been created that seem to have settl...
Business Building Zuber Beton GmbH
For its new office building, Zuber Beton GmbH was looking for a reliable heating and cooling system that could be installed quickly and easily in ther...
Semi-detached house Allersberg
In the case of the 2-family house in Allersberg, the installation of the KS-QUADRO THERM system provides for wall tempering as well as wall cooling in...
Residential Kugelmanngasse
In the new district area in Vienna's 23rd district, 49 privately financed condominiums were built with building component activation. The developer is...