Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning

c
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump which gets the heat and cold from 11 geothermal probes with 150 m depth. A photovoltaic system is installed on the greened flat roof for the company's own electricity needs.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
Westlink
New urban spaces have been created on the Westlink site near Zurich-Altstetten railroad station. Their identity is largely determined by the design an...
Sommerein Wolfsbrunn
The housing complex consists of 14 terraced houses and a building with 22 apartments for young and assisted living ("Generations Living")....
LivingImFranks
At the beginning of 2022, a residential complex with a total of 83 attractive residential units and 3 commercial premises was completed on the propert...
Fiscal office Aachen
The tax office center on Krefelder Straße in Aachen houses a total of five offices. In its internal structure, the 71 x 118 m building is divided into...
Passive house
Passive house in solid construction with concrete core activation and firewood stove: The heat supply is completely with renewable energy....
Das Haus am Park
The "Haus am Park" is a relatively small residential building with only 29 apartments, three offices and a dance studio on the first floor and is loca...
ETA Factory
The ETA factory of TU Darmstadt is located in the Lichtwiese campus and was completed in March 2016. Since then, the model factory has been used in pa...
Wientalterrassen
With the Wientalterrassen project, the non-profit developer WBV-GPA is building a sustainable showcase project in which a large number of innovations ...
Villa K
An art collector wished for a villa. Architect Peter Todorov was allowed to fulfill his wish. The result is impressive and convinces with its spatial ...
Project wind heating 2.0
Wind energy now accounts for the largest share of electricity generation from renewables in Germany. However, especially during the typically windy wi...