Logistics hall

The building is heated and cooled via a thermally activated floor slab. Thermal energy is provided by a reversible heat pump connected to eleven geothermal probes extending to a depth of 150 m. A photovoltaic system installed on the green roof contributes to the building’s on-site electricity demand.

Building owner

Apparatebau Kirchheim-Teck GmbH

Finalization

2019

Heating demand

41,9 kWh/m²a

Architecture
Special planning
Ingenieurplanung Söllner
Ingenieurplanung Söllner
ZAB
Ingenieurplanung Söllner
ZAB
Ingenieurplanung Söllner