The second construction project, the former data center of the City of Vienna, at Rathausstrasse 1, was completed for BUWOG in August 2017. In 3,450 operational hours, almost 74,000 kg of materials were dismantled and recycled. A turnover of 50,000 euros was generated.
Completion of dismantling
2017
Building owner
BUWOG GmbH
Specialist planning
Project participants
Effect achieved
- 3400 hours of employment / 10 people employed
- 0.3 tons for re-use
- 171 tons disposed of
- 73.9 tons recycled

Romm
Other interesting projects from the category Circular economy
SAP Labs Munich Campus
The SAP Labs Munich Campus in Garching is a new building designed to accommodate work, research, and teaching. Jointly used by SAP and the Technical U...
ASG - Residential complex
The ASG residential complex on the northern edge of Vienna, close to the Marchfeld Canal, comprises two buildings with a striking saw-tooth structure ...
Büscher Recyclinghaus
The Büscher Recyclinghaus in Heek is an innovative multi-family residential building constructed entirely from recycled demolition materials. It uses ...
Conversion of Kindergarten Mööslistrasse
The Kindergarten Mööslistrasse is located on the first floor of a municipal maintenance facility in Zurich-Wollishofen and was developed as a pilot pr...
Telegraf 7 Office
Vienna's Lehargasse 7, close to the Naschmarkt, is home to the former telephone exchange of the Imperial and Royal Post and Telegraph Directorate. Pos...
CIRCULAR TIME LAB - Lucerne Summer
Circular Time Lab is a three-year design-build project by the Lucerne University of Applied Sciences and regional timber SMEs. Following the principle...
CRCLR-Haus
The CRCLR building in Berlin-Neukölln was remodelled in 2023 in line with the principles of the circular economy. The focus was on recycling and reusi...
Former VHS Stöbergasse
Between July and September 2020, BauKarussell carried out the utilization-oriented dismantling of the former bfi and VHS site in Vienna-Margareten on ...
Comprehensive renovation of Prinzersdorf Town Hall with extension
The classic reinforced-concrete building of post-war modernism (completed in 1973, designed by architect Hable) was on the verge of demolition. Its de...
Housing project „GeWoZu“
The GeWoZu project combines 12 individual flats for 20 adults and 13 children in a sustainably built terraced house. The use of recycled materials suc...