Glass Palace
The second construction project, the former data center of the City of Vienna, at Rathausstrasse 1, was completed for BUWOG in August 2017. In 3,450 operational hours, almost 74,000 kg of materials were dismantled and recycled. A turnover of 50,000 euros was generated.
Completion of dismantling
2017
Building owner
BUWOG GmbH
Specialist planning
Project participants
Effect achieved
- 3400 hours of employment / 10 people employed
- 0.3 tons for re-use
- 171 tons disposed of
- 73.9 tons recycled
Romm
Other interesting projects from the category Circular economy
Stadtwerke Neustadt in Holstein
New Administrative Building for Stadtwerke Neustadt in Holstein – Focus on Resource Efficiency and Energy Performance
The new headquarters of Stadtwe...
Extension and refurbishment BG/BRG Mattersburg
The secondary school in Mattersburg was renovated and extended. An atrium-shaped extension with 18 classes, a new main entrance, cloakrooms and dining...
Mercedes Benz Factory 56
Factory 56 at the Mercedes-Benz site in Sindelfingen is considered a flagship project for sustainable and digitalized car manufacturing. Featuring inn...
Vienna Patent Office
The European Patent Office in Vienna - located between Belvedere Palace and the Botanical Gardens - is undergoing a comprehensive refurbishment. The b...
Reininghaus Primary School
The Reininghaus Primary School was awarded klimaaktiv Gold for its comprehensive sustainability concept. This standard was achieved primarily through ...
Residential building St. Vincent
On the site of a former nursing school in Wangen, the Vinzenz-Quartier was built in 2024 with a total of 122 residential units in six buildings. Three...
Housing project „GeWoZu“
The GeWoZu project combines 12 individual flats for 20 adults and 13 children in a sustainably built terraced house. The use of recycled materials suc...
RAG-Stiftung und RAG AG Zollverein - A circular building
With the new building for the RAG-Stiftung and RAG AG on the Zollverein site, a circular building is being created that redefines sustainable construc...
The Raiqa - the Innsbruck centre quarter
Raiffeisen-Landesbank Tirol AG is building a new headquarters between Südtiroler Platz and Bozner Platz, creating a lively neighbourhood in Innsbruck....
CIRCULAR TIME LAB - Lucerne Summer
Circular Time Lab is a three-year design-build project by the Lucerne University of Applied Sciences and regional timber SMEs. Following the principle...