Glass Palace
The second construction project, the former data center of the City of Vienna, at Rathausstrasse 1, was completed for BUWOG in August 2017. In 3,450 operational hours, almost 74,000 kg of materials were dismantled and recycled. A turnover of 50,000 euros was generated.
Completion of dismantling
2017
Building owner
BUWOG GmbH
Specialist planning
Project participants
Effect achieved
- 3400 hours of employment / 10 people employed
- 0.3 tons for re-use
- 171 tons disposed of
- 73.9 tons recycled
Romm
Other interesting projects from the category Circular economy
Paul & Rosa
In Schweinfurt, Riedel Bau AG realized the residential and research project Paul & Rosa on an approximately 1,400-square-meter plot in the Hochfel...
Saint Romain Le Puy
Urban renewal in the historic centre of Saint Romain Le Puy
Revitalizing a town center means implementing a set of actions that renew its attractiven...
Anif elementary school
The Anif elementary school used 1,067 cubic meters of recycled concrete, which accounts for around 32% of the total in-situ concrete. The recycled con...
Building A – Werkstadt Areal, complete refurbishment
Building A is part of the heritage-listed Werkstadt site in Zürich-Altstetten and underwent comprehensive refurbishment during the second construction...
Building Q – Werkstadt Areal, full refurbishment
Building Q is a central hall on the former SBB workshop site in Zürich-Altstetten. Originally constructed in 1911, the industrial building was compreh...
Historic Renovation in Van-der-Nüll-Gasse
The renovation project in Van-der-Nüll-Gasse, Vienna-Favoriten, marks Austria’s first circular-economy-based modernization of a 'Gründerzeit' building...
Innovation Greenhouse Bonn
The Innovation Greenhouse in Bonn-Oberkassel is a triangular office complex comprising six main floors and one technical level. The new structure acts...
Büscher Recyclinghaus
The Büscher Recyclinghaus in Heek is an innovative multi-family residential building constructed entirely from recycled demolition materials. It uses ...
Youth Center Ingersheim
Real-World Laboratory S210: from construction aid to permanent architecture: Repurposing concrete formwork from the Stuttgart 21 project into a local ...
Comprehensive renovation of Prinzersdorf Town Hall with extension
The classic reinforced-concrete building of post-war modernism (completed in 1973, designed by architect Hable) was on the verge of demolition. Its de...