Kulturkraftwerk oh456
The plus-energy office building oh456 with attached small hydropower plant serves as a prototype for testing innovative technologies. The building will be made accessible to a wider public as a venue for a wide range of events, as a demonstration and lecture object on the subject of climate relief, and as a joint advertising platform for sustainable construction.
Finalization
2014
Floor space
1.569 m²
Structural engineering
Reibenwein-Forsthuber, Kurz Pock
Planning

Walter Luttenberger
The Kulturkraftwerk is a hybrid building made of unreinforced stamped concrete walls and cross-laminated timber panels. On three levels the building offers space for several individual offices, on the first floor is situated a library, bread and games and an event room.

Walter Luttenberger

Walter Luttenberger

Walter Luttenberger
Other interesting projects from the category Thermal Activated Building, Ecology & Sustainability & Low Tech
House W
This residential house reflects the trend of monolithic construction in modern timber construction and shows that tradition and new developments can b...
BaxBox
Heating system from biogenic fuels, smallest apartment 35m2, wooden construction, predominant use of insulating materials from renewable materials, av...
Semi-detached house Purkersdorf
In an intensive, cooperative planning process with the users, the team around architect Christoph Treberspurg built a unique semi-detached house with ...
Köln Triangle
The Köln Triangle office building is located directly on the Rhine, opposite Cologne Cathedral. The ground plan shape of the 103 meter high tower is a...
VIER WINKEL - Business house and hotel B&B
A modern concept on a traditional foundation - the business building VIER WINKEL. An interplay of different business models, unique in their appearanc...
Sonnenhaus office building
The building complex has a residential / usable area of approx. 600 m², of which 420 m² are office / 180 m² residential....
Cultural center Hallwang
The 400-guest multi-purpose hall was built in 2013 and serves the community for theater and music evenings, cabaret programs, balls and seminars. Spec...
Office building COPA-DATA
Encased in a homogeneous, satin-matt metal façade, the exterior of the compact new office building of software developer COPA-DATA conveys the objecti...
Südpack
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story o...
Vitrahaus
The architects stacked a total of 12 houses with gable roofs on top of each other, on five levels, to form the Vitrahaus....