Kulturkraftwerk oh456
The plus-energy office building oh456 with attached small hydropower plant serves as a prototype for testing innovative technologies. The building will be made accessible to a wider public as a venue for a wide range of events, as a demonstration and lecture object on the subject of climate relief, and as a joint advertising platform for sustainable construction.
Finalization
2014
Floor space
1.569 m²
Structural engineering
Reibenwein-Forsthuber, Kurz Pock
Planning
Walter Luttenberger
The Kulturkraftwerk is a hybrid building made of unreinforced stamped concrete walls and cross-laminated timber panels. On three levels the building offers space for several individual offices, on the first floor is situated a library, bread and games and an event room.

Walter Luttenberger

Walter Luttenberger

Walter Luttenberger
Other interesting projects from the category Thermal Activated Building– Efficient heating & cooling & Ecology & Sustainability
Bus depot
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with ...
Wohnmanufaktur Taxenbach
The joinery manufactures furniture in wood, but also complete interiors with wood, stone, glass, steel and fabrics. On a total area of 1,200 m² on the...
Bildungscampus Deutschordenstraße, Wien
The new Deutschordenstraße education campus in Vienna's Penzing district is another completely fossil-free educational building that demonstrates how ...
Blue Living Grödig
The residential complex "Blue Living Grödig" was planned in the context of sustainable development. During the design process, it was taken care to en...
Concert House Blaibach
A solitaire made of concrete, in the middle of the village square of Blaibach - an architectural highlight and at the same time the centerpiece of the...
Waldkliniken Eisenberg
In the new ward building of the Waldkliniken Eisenberg, the patient is the guest - the all-round feel-good building was also given a sustainable energ...
Addition winery Reeh
Halbritter Architects used concrete to exploit all the refinements of the building material for the extension to the Reeh winery. Concrete was produce...
Klimahaus
The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...
Music school Bad Saarow
Rainer Tassler and Violetta Tassler-Liebsch's new construction project in Bad Saarow comprises three buildings. Eight private residential units and fi...
Südpack
After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story o...