Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designed as a passive house with a ventilation system.
Architecture
Finalization
2012
Floor space
325 m²
Heating demand
18,4 kWh/m²a
Energy planning

Andreas Volker

Andreas Volker
Other interesting projects from the category Thermal Activated Building, Ecology & Sustainability & Low Tech
Primary school Wals-Siezenheim
The new building for the primary school, after-school care and other communal functions forms an anchor point for the entire town in the no-man's land...
Storchennest
The house in Kuchl consists of an insulated lightweight floor slab, the exterior timber frame walls, the room-dividing CLT structures and the prefabri...
Klimahaus
The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...
office building Maschinenring
For the state headquarters of the machinery ring, the client wanted a constructive solid wood building of high energy efficiency with concrete core ac...
Sports hall Liefering
With the triple sports hall in Liefering, the city of Salzburg has a pilot project regarding Smart City Standard. As a plus-energy building, it was aw...
Der Stadtelefant
A new Gründerzeit - there is more building going on in Vienna than there has been in a long time. From the synergies of three architectural firms acti...
House of culture Kals
After the teardown of two existing buildings, the new culture house was built on a cramped building site on the Kalser Landesstraße. The construction ...
New building criminal justice center
On the site at the southern Oberwiesenfeld / Leonrodplatz in Munich, a multi-storey building with three inner courtyards was created, in which all are...
Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump....
Agricultural college Bruck
For the specialized training 'wood processing', the province of Salzburg needed a model workshop, which should be possible at each of the four agricul...