Gusswerk
Relatively low-cost construction, flexibly usable areas, solid building made of exposed concrete with six attached cubes made of opaque polycarbonate facades.
Building owner
Gusswerk Eventfabrik, Immo Partner Immobilien GesmbH
Finalization
2012
Architecture
Specialist planning
structural engineering: Marius Consulting; local construction supervision: Spiluttini Bau GmbH

Volker Wortmeyer
Relatively low-cost construction, flexibly usable areas, solid building made of exposed concrete with six attached cubes made of opaque polycarbonate facades.
Other interesting projects from the category Low Tech
House Baierl
The monolithic single-family house was built with 50 cm thick plane bricks. As a natural building material, they make the building durable....
House W
This residential house reflects the trend of monolithic construction in modern timber construction and shows that tradition and new developments can b...
Sports hall Liefering
With the triple sports hall in Liefering, the city of Salzburg has a pilot project regarding Smart City Standard. As a plus-energy building, it was aw...
CO-livingSeeparq
Live, work, share: SEEPARQ combines everything under one roof. 55 freely financed condominiums with large balconies, freely designable apartment sizes...
BaxBox
Heating system from biogenic fuels, smallest apartment 35m2, wooden construction, predominant use of insulating materials from renewable materials, av...
Catholic competence center Salzburg
The Caritas headquarters in Salzburg now accommodate around 100 employees. In addition to a counseling service, Friedensstraße now also houses the six...
Redevelopment Hallein
The gentle low-tech revitalization transformed the inhospitable old building into comfortable, contemporary living space in the middle of Hallein's hi...
Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designe...
FUX in Karlsruhe
On the site of the former slaughterhouse in Karlsruhe's Oststadt district, the Festigungs- und Expansionszentrum, or FUX for short, has recently provi...
Schools by the lake, Hard
The ‘Schule am See’ in Hard on Lake Constance, a neighbouring municipality of Bregenz, is home to a primary and secondary school for around 650 pupils...