Semi-detached house Allersberg
In the case of the 2-family house in Allersberg, the installation of the KS-QUADRO THERM system provides for wall tempering as well as wall cooling in all rooms.
Finalization
2016
Heating Demand
31,9 kWh/m²a
Architecture
Specialist Planning
Fa. Schiffert

Zapf Daigfuss Vertriebs-GmbH
In the case of the 2-family house in Allersberg, the installation of the KS-QUADRO THERM system provides for wall tempering as well as wall cooling in all rooms.
According to the client, energy-related reasons as well as the healthy and constant indoor climate all year round, which is created by the radiant heat of the KS wall, were the decisive decision-making criteria for using this system in his new building.
(Text source: Zapf Daigfuss in shortened version)

Zapf Daigfuss Vertriebs-GmbH
Other interesting projects from the category Thermal Activated Building
Project wind heating 2.0
Wind energy now accounts for the largest share of electricity generation from renewables in Germany. However, especially during the typically windy wi...
SST Solar
The new building with a total usable area of 1,500 m² was erected in steel and reinforced concrete construction with industrially prefabricated buildi...
ZSW Baden-Württemberg
The Center for Solar Energy and Hydrogen Research Baden-Württemberg, ZSW, moved into its new institute building at the Stuttgart site last year. The s...
Q 11 Simmering
The new-build urban quarter, Quartier 11, constructed in 2018, is designed as a load-bearing steel structure with solid reinforced concrete floors. Th...
Administration in Beilngries
A new administration building for approx. 150 employees was to be constructed for Schmidt-Seeger GmbH with its Beilngries site. The building is divide...
Single family house Wimmer
This house has a modern design, yet integrates into the Bavarian landscape and is equipped with advanced technology....
Administration building at the power plant Zolling
In the case of the administration building for the E.ON power plant in Zolling, the themes of light and energy were the factors that determined the fo...
Sports hall Liefering
With the triple sports hall in Liefering, the city of Salzburg has a pilot project regarding Smart City Standard. As a plus-energy building, it was aw...
Residential complex in Elsbethen
Each of the two apartment buildings in Elsbethen was built to passive house standards and has five apartments. These are heated with concrete energy s...
Sonnenhaus office building
The building complex has a residential / usable area of approx. 600 m², of which 420 m² are office / 180 m² residential....