Thermal Activated Building
The concept of building component activation aims to utilise the stored thermal energy of building components such as walls, ceilings or floors to efficiently heat or cool buildings. This is achieved through the targeted integration of pipes or lines into the building components. The map presents implemented projects that use component activation technologies to realise energy-efficient building air conditioning.
Salewa
The building complex, which resembles the mountain massif of the Dolomites, is composed of a conglomerate of cuboids and polygonal structures that hou...
Wagnertec
The office spaces are characterized by the wooden ceiling beams and the visible concrete ceiling, the facade by the robust masonry with window reveals...
SST Solar
The new building with a total usable area of 1,500 m² was erected in steel and reinforced concrete construction with industrially prefabricated buildi...
Viertel Hoch Zwei
Gewog Arthur Krupp worked intensively on a completely new concept for social housing, which is considered a showcase project in terms of energy techno...
Q 11 Simmering
The new-build urban quarter, Quartier 11, constructed in 2018, is designed as a load-bearing steel structure with solid reinforced concrete floors. Th...
Das Haus am Park
The "Haus am Park" is a relatively small residential building with only 29 apartments, three offices and a dance studio on the first floor and is loca...
com22sQuare
The remarkable residential complex on a commercially used base zone is located at the conspicuous intersection of Ziegelhofstrasse and Quadenstrasse, ...
com22PLUS
On the northern outskirts of Vienna - in the area of Berresgasse / Hausfeldstraße, 1220 Vienna - a new urban district is being created. On 19 hectares...
Semi-detached house Purkersdorf
In an intensive, cooperative planning process with the users, the team around architect Christoph Treberspurg built a unique semi-detached house with ...
Baumeisterhaus
The "Landesinnung Bau", as the building owner, has constructed a model project in Graz: 22 residential units with a size of 35 to 60 square meters off...
Blue Living Grödig
The residential complex "Blue Living Grödig" was planned in the context of sustainable development. During the design process, it was taken care to en...
Residential complex in Elsbethen
Each of the two apartment buildings in Elsbethen was built to passive house standards and has five apartments. These are heated with concrete energy s...
Werner-Heisenberg-Gymnasium
Three square structures occupy building sites in the landscaped context. This creates a charming dialogue with the pavilion-like, precise buildings....
ETA Factory
The ETA factory of TU Darmstadt is located in the Lichtwiese campus and was completed in March 2016. Since then, the model factory has been used in pa...
Climatic room
As part of the Copernicus research project "Synergie", a climate room was completed in 2019 in the hall area of the ETA factory (TU Darmstadt), which ...
Jackbox
As part of a cooperation project between the TU Delft and the Detmold School of Architecture and Interior Design, a thermally activated pavilion in sa...
Music school Bad Saarow
Rainer Tassler and Violetta Tassler-Liebsch's new construction project in Bad Saarow comprises three buildings. Eight private residential units and fi...
Vitrahaus
The architects stacked a total of 12 houses with gable roofs on top of each other, on five levels, to form the Vitrahaus....
Klimahaus
The Klimahaus sits like a ship in the new Havenwelten tourist area. It actually consists of two separate reinforced concrete structures with a glass f...
Sonnenhaus office building
The building complex has a residential / usable area of approx. 600 m², of which 420 m² are office / 180 m² residential....