WSB- Residential complex Wieselburg
The residential complex on the northern edge of Wieselburg consists of four buildings: an arcade type with twelve units and three point blocks with a total of 50 units. These are barrier-free and offer different types of flats for singles to large families. Each flat has a private outdoor area. The complex includes central green spaces that serve as meeting points and play areas, as well as covered bicycle parking spaces. The building is connected to district heating.
A recycled concrete content of 15% was achieved.
Building owner
WET-Wohnungseigentümer Gemeinn. WohnbaugesmbH
Architecture
Structural engineering
KS Ingenieure
Producer of recycled concrete
Completion
2018
GFA
7.775 m²
Heating demand
19,8 kWh/m²a
@ Wopfinger
Other interesting projects from the category Circular economy
MA 48 Crew building
The MA 48 team building in Vienna-Simmering is the first building to use recycled concrete. The recycled content in the concrete is around 15 - 20 per...
Campus Rauner
The old Rauner primary school, a sprawling conglomerate from the 1960s, was largely demolished. In its place, a compact, three-storey building is now ...
ERDEN factory building
The ERDEN factory building is located in the small municipality of Schlins in Vorarlberg - a pioneering project that was specially designed for the pr...
From Prestressed Concrete to Carbon Concrete – Refurbishment of the Hyparschale Magdeburg
Magdeburg. The Hyparschale, designed in 1969 by structural engineer Ulrich Müther, is the largest surviving shell roof of its kind and a key work of E...
MedUni Campus Mariannengasse
The Medical University of Vienna and the Federal Real Estate Company are building the new MedUni Campus Mariannengasse on the site of the former Wien ...
CIRCULAR TIME LAB - Lucerne Summer
Circular Time Lab is a three-year design-build project by the Lucerne University of Applied Sciences and regional timber SMEs. Following the principle...
Glass Palace
The second construction project, the former data center of the City of Vienna, at Rathausstrasse 1, was completed for BUWOG in August 2017. In 3,450 o...
Greenity Gate
The Greenity Gate in Guntramsdorf is a commercial complex from the 1970s that is being transformed into a modern industrial and office hub. Covering a...
Vorklinik Graz
BauKarussell 2023 was commissioned with the demolition of the former pre-clinic in Graz over a period of seven months. Between February and August, th...
Reininghaus Primary School
The Reininghaus Primary School was awarded klimaaktiv Gold for its comprehensive sustainability concept. This standard was achieved primarily through ...