Former VHS Stöbergasse
Between July and September 2020, BauKarussell carried out the utilization-oriented dismantling of the former bfi and VHS site in Vienna-Margareten on behalf of SOZIALBAU AG. Installation boxes and floor coverings were removed, preparing 35,800 kg of material for sorted disposal. In addition, existing re-use products were secured and 800 kg of ash parquet were conveyed for reuse. A total of 36,600 kg of materials were moved using 720 hours of social work. The operational work was carried out by the socio-economic BauKarussell partner Die KÜMMEREI.
Completion of dismantling
2020
Building owner
SOZIALBAU AG
Specialist planning
Project participants
Effect achieved
- 720 hours of employment / 7 people employed
- 0.8 tons for re-use
- 35.8 tons recycled

BauKarussell
Other interesting projects from the category Circular economy
MedUni Campus Mariannengasse
The Medical University of Vienna and the Federal Real Estate Company are building the new MedUni Campus Mariannengasse on the site of the former Wien ...
High Tech Campus Villach
The High Tech Campus Villach (HTC) places a strong emphasis on sustainability and the principles of circular economy in its architecture. The building...
Magdas Hotel
As part of an extensive conversion, a former priest's residence was transformed into a hotel with 85 rooms, a restaurant, a pub garden and a guest gar...
Sportpark Ost Regensburg
A new sports centre with an indoor swimming pool and athletics hall is being built near the former Prinz Leopold barracks. Joint planning allows syner...
Telegraf 7 Office
Vienna's Lehargasse 7, close to the Naschmarkt, is home to the former telephone exchange of the Imperial and Royal Post and Telegraph Directorate. Pos...
ZIN - Brussels
The ZIN project developed by Befimmo comprises the renovation of Towers 1 and 2 of the Brussels World Trade Centre in the north of Brussels. After dem...
Mercedes Benz Factory 56
Factory 56 at the Mercedes-Benz site in Sindelfingen is considered a flagship project for sustainable and digitalized car manufacturing. Featuring inn...
Housing project „GeWoZu“
The GeWoZu project combines 12 individual flats for 20 adults and 13 children in a sustainably built terraced house. The use of recycled materials suc...
Conversion of Kindergarten Mööslistrasse
The Kindergarten Mööslistrasse is located on the first floor of a municipal maintenance facility in Zurich-Wollishofen and was developed as a pilot pr...
CIRCULAR TIME LAB - Lucerne Summer
Circular Time Lab is a three-year design-build project by the Lucerne University of Applied Sciences and regional timber SMEs. Following the principle...