Bus depot
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with attached bus washing facility, as well as a carport.
Ingenieurplanung Söllner
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with attached bus washing facility, as well as a carport. On the neighboring property there is a bus port in steel construction with arched roof structure. A heat pump uses the ground as an energy source via 118 activated bored piles. The installed concrete core activation is used to heat and cool the building.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
Agricultural college Bruck
For the specialized training 'wood processing', the province of Salzburg needed a model workshop, which should be possible at each of the four agricul...
Bildungscampus Liselotte-Hansen-Schmidt
With the Liselotte Hansen Schmidt Campus in the north of the Urban Lakeside Aspern, which opened in 2021, the City of Vienna has succeeded in creating...
Business Building Zuber Beton GmbH
For its new office building, Zuber Beton GmbH was looking for a reliable heating and cooling system that could be installed quickly and easily in ther...
University College of Teacher Education Tyrol
The renovation and expansion of the Tyrol University of Education demonstrated how building renovation can be carried out in a resource-efficient, tec...
ILV - TZ Klagenfurt
In 2008, the 6-story Institute for Food Safety and Veterinary Affairs was built for all laboratory units of the Carinthian provincial government with ...
ecoSquare Bamberg
The "ecoSquare" is a sustainable inner-city neighborhood in Bamberg. It combines social interaction, sustainable construction and the implementation o...
Office building COPA-DATA
Encased in a homogeneous, satin-matt metal façade, the exterior of the compact new office building of software developer COPA-DATA conveys the objecti...
Westlink
New urban spaces have been created on the Westlink site near Zurich-Altstetten railroad station. Their identity is largely determined by the design an...
Parish Seetal
The construction emphasizes constructive wood protection. The heating works fully solar by means of concrete core activation. The building was designe...
Residential complex in Elsbethen
Each of the two apartment buildings in Elsbethen was built to passive house standards and has five apartments. These are heated with concrete energy s...