Bus depot
The goal of Jäger KG was to unite all services under one roof with the new construction of the bus depot, administration, workshop, tire storage with attached bus washing facility, as well as a carport. On the neighboring property, there is a bus port made of steel with an arched roof structure. A heat pump uses the ground as an energy source through 118 activated bored piles. The installed concrete core activation is used for heating and cooling the building.
Ingenieurplanung Söllner

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building– Efficient heating & cooling
Jackbox
As part of a cooperation project between the TU Delft and the Detmold School of Architecture and Interior Design, a thermally activated pavilion in sa...
Auenwerkstatt
The Auenwerkstatt is a small school building in the middle of the Salzachauen: an all-wood building, completely self-sufficient, powered purely by the...
Care home "Gemeinsam (er)leben"
ÖJAB has constructed the forward-looking Neumargareten nursing home, which includes building component activation. In terms of ecology, the building i...
Addition winery Reeh
Halbritter Architects used concrete to exploit all the refinements of the building material for the extension to the Reeh winery. Concrete was produce...
office building Maschinenring
For the state headquarters of the machinery ring, the client wanted a constructive solid wood building of high energy efficiency with concrete core ac...
VIER WINKEL - Business house and hotel B&B
A modern concept on a traditional foundation - the business building VIER WINKEL. An interplay of different business models, unique in their appearanc...
SST Solar
The new building with a total usable area of 1,500 m² was erected in steel and reinforced concrete construction with industrially prefabricated buildi...
Das Koloman
87 unique apartments with a high feel-good factor are being built in the heart of the Weinviertel's largest town.
The excellent infrastructure of Stoc...
Logistics hall
The building is heated and cooled via a thermally activated floor slab. Thermal energy is provided by a reversible heat pump connected to eleven geoth...
Cultural center Hallwang
The 400-guest multi-purpose hall was built in 2013 and serves the community for theater and music evenings, cabaret programs, balls and seminars. Spec...