Sommerein Wolfsbrunn
The housing complex consists of 14 terraced houses and a building with 22 apartments for young and assisted living ("Generations Living").
Building owner
SÜDRAUM / EBSG
Finalization
2019
Heating demand
Building part "Generations Living": 19,39 kWh/m²a; Terraced houses: floor space: je 142m²
Architecture
Specialist planning
© suedraum
The residential complex consists of 14 terraced houses and a building with 22 apartments for young and assisted living ("Generations Living"). Heat supply and cooling are provided by thermal activation of the concrete ceilings in combination with a heat pump and geothermal probes. The control of the heat pump and the thermal component activation is intended to provide for peak load balancing in the event of energy surplus from wind turbines.
Other interesting projects from the category Thermal Activated Building– Efficient heating & cooling & Energy future
Climatic room
As part of the Copernicus research project "Synergie", a climate room was completed in 2019 in the hall area of the ETA factory (TU Darmstadt), which ...
Campo Breitenlee
The Campo Breitenlee “Living Together” project combines social housing with an innovative energy concept based on 100 percent renewable energy. Design...
Headquarter Windkraft Simonsfeld
With the expansion of its headquarters in Ernstbrunn, Windkraft Simonsfeld AG is delivering an ecological flagship project. The new building, designed...
CO-livingSeeparq
Live, work, share: SEEPARQ combines everything under one roof. 55 freely financed condominiums with large balconies, freely designable apartment sizes...
Semi-detached house Purkersdorf
In an intensive, cooperative planning process with the users, the team around architect Christoph Treberspurg built a unique semi-detached house with ...
Residential complex in Elsbethen
Each of the two apartment buildings in Elsbethen was built to passive house standards and has five apartments. These are heated with concrete energy s...
the mirror
The project "mirror", the freshly occupied residential high-rise in the new Reininghaus quarter, proves that good architecture, sustainability and aff...
SST Solar
The new building with a total usable area of 1,500 m² was erected in steel and reinforced concrete construction with industrially prefabricated buildi...
Bildungscampus Liselotte-Hansen-Schmidt
With the Liselotte Hansen Schmidt Campus in the north of the Urban Lakeside Aspern, which opened in 2021, the City of Vienna has succeeded in creating...
City hall Oberndorf
As the "new center" of the municipality, the new Oberndorf town hall is a meeting place for citizens, municipal representatives and employees alike. T...


