Administration building Association for Rural Development
The Association for Rural Development (VLE) Upper Palatinate has realised a pioneering project with the construction of its new administration building in Tirschenreuth. Planned by Brückner & Brückner Architekten, the building combines cold bricks and filled masonry bricks with solid wood-clay ceilings from Leipfinger-Bader. This innovative construction method sets new standards for sustainable and future-orientated building. The compact cube with atrium provides 15 office workstations and does not use active cooling, which minimises energy requirements. With an investment volume of 2.5 million euros, the project promotes regional development and creates new jobs.
Finalisation
2025
GFA
722 m²
Architecture
Construction company
Manufacturer recycling bricks
Brückner & Brückner Architekten

Brückner & Brückner Architekten

Brückner & Brückner Architekten
Other interesting projects from the category Circular economy
Building A – Werkstadt Areal, complete refurbishment
Building A is part of the heritage-listed Werkstadt site in Zürich-Altstetten and underwent comprehensive refurbishment during the second construction...
Hensel barracks Villach
The Austrian federal army commissioned BauKarussell with the use-orientated demolition of the Hensel barracks in Villach. Together with Schindel &...
District Office Esslingen
STRABAG subsidiary ZÜBLIN planned and constructed the new Esslingen District Office building on a turnkey basis – as a two-stage pilot project for cir...
Former VHS Stöbergasse
Between July and September 2020, BauKarussell carried out the utilization-oriented dismantling of the former bfi and VHS site in Vienna-Margareten on ...
Korbach Town Hall
With the demolition and new construction of the town hall, the current approaches of urban mining and circular construction were trialled in a solid b...
Am Hirschfeld
The Viennese housing project ‘Am Hirschfeld’ demonstrates how energy self-sufficiency can be integrated into the social housing sector. The focus is o...
The Raiqa - the Innsbruck centre quarter
Raiffeisen-Landesbank Tirol AG is building a new headquarters between Südtiroler Platz and Bozner Platz, creating a lively neighbourhood in Innsbruck....
Vorklinik Graz
BauKarussell 2023 was commissioned with the demolition of the former pre-clinic in Graz over a period of seven months. Between February and August, th...
Cube One TU Nürnberg
The first building of the new campus of the Technical University of Nuremberg (UTN), Cube One, has been home to the Executive Board and various depart...
VILLAGE IN THE THIRD
In Vienna's 3rd district, an inner urban expansion area is being developed on an area measuring over 11 hectares. The location of the site offers pote...