Coca-Cola plant
Through environmentally friendly manual dismantling and the optimal synergy of re-use and recycling, €100,000 in sales were generated during the dismantling of the Coca-Cola plant on behalf of the building consortium of eight property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA). For example, 5,000 roof panels from the Coca-Cola plant were made available for reuse on site as thermal insulation in the new building in the Biotope City Quarter. 3,000 m2 of extensive green roofs, i.e. the top soil substrate layer including the plant cover, have also been secured and are ready for use.
Completion of dismantling
2017
Building owner
Building consortium of 8 property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA)
Specialist planning
Project participants
Effect achieved
- 4200 hours of employment / 15 people employed
- 450 tons for re-use

BauKarussell
Other interesting projects from the category Circular economy
RAG-Stiftung und RAG AG Zollverein - A circular building
With the new building for the RAG-Stiftung and RAG AG on the Zollverein site, a circular building is being created that redefines sustainable construc...
Extension and refurbishment BG/BRG Mattersburg
The secondary school in Mattersburg was renovated and extended. An atrium-shaped extension with 18 classes, a new main entrance, cloakrooms and dining...
Wohnbau Leyserstrasse
The ‘Rosalie’ residential building in Penzing is part of a neighbourhood development at the Theodor Körner barracks. The barracks park was made access...
Housing project „GeWoZu“
The GeWoZu project combines 12 individual flats for 20 adults and 13 children in a sustainably built terraced house. The use of recycled materials suc...
General refurbishment of parliament
Following its general refurbishment, the Austrian Parliament is the first historic building to receive the “klimaaktiv Gold” certificate and is a true...
Cube One TU Nürnberg
The first building of the new campus of the Technical University of Nuremberg (UTN), Cube One, has been home to the Executive Board and various depart...
EDGE Südkreuz Berlin
EDGE Südkreuz Berlin is an innovative seven-story office complex constructed using a modular timber-hybrid design. It consists of two standalone build...
WSB- Residential complex Wieselburg
The residential complex on the northern edge of Wieselburg consists of four buildings: an arcade type with twelve units and three point blocks with a ...
MA 48 Crew building
The MA 48 team building in Vienna-Simmering is the first building to use recycled concrete. The recycled content in the concrete is around 15 - 20 per...
Anif elementary school
The Anif elementary school used 1,067 cubic meters of recycled concrete, which accounts for around 32% of the total in-situ concrete. The recycled con...