Logistics hall
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump.
Building owner
Apparatebau Kirchheim-Teck GmbH
Finalization
2019
Heating demand
41,9 kWh/m²a
Architecture
Special planning

c
The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump which gets the heat and cold from 11 geothermal probes with 150 m depth. A photovoltaic system is installed on the greened flat roof for the company's own electricity needs.

Ingenieurplanung Söllner

Ingenieurplanung Söllner
Other interesting projects from the category Thermal Activated Building
FUX in Karlsruhe
On the site of the former slaughterhouse in Karlsruhe's Oststadt district, the Festigungs- und Expansionszentrum, or FUX for short, has recently provi...
Seniors residence Beeskow
In Beeskow, a senior citizens' residence and three urban villas have been built to provide a new home for up to 200 residents since 2021. The large-sc...
Bel & Main Vienna
Bel & Main Vienna is a first-class mixed-use project being built right next to the main train station and Schweizergarten. All advantages of concr...
Werner-Heisenberg-Gymnasium
Three square structures occupy building sites in the landscaped context. This creates a charming dialogue with the pavilion-like, precise buildings....
Südweststrom
On the site of the Tübingen public utility company in the south of the university town, Steimle Architekten realized a new administration building for...
New building criminal justice center
On the site at the southern Oberwiesenfeld / Leonrodplatz in Munich, a multi-storey building with three inner courtyards was created, in which all are...
Future Art Lab of the MDW
University building with concert hall and arthouse cinema: The Future Art Lab for the mdw - University of Music and Performing Arts Vienna - plays all...
Single family house Zirndorf
The single-family house in Zirndorf was built with the KS-QUARO THERM system, a complete system for temperature control of wall surfaces....
ÖKK-Headquarter
The architecture of the new ÖKK headquarters points to its public significance as part of the new urban fabric of Landquart. It thus follows the urban...
Waldkliniken Eisenberg
In the new ward building of the Waldkliniken Eisenberg, the patient is the guest - the all-round feel-good building was also given a sustainable energ...