Thermal Activated Building

Thermal component activation uses the storage mass of ceilings, floors or walls for energy-efficient temperature control in buildings. Pipes integrated into solid components enable uniform heating and cooling – conserving resources and providing comfort. The innovation map for component activation presents implemented projects that use component activation technologies to achieve energy-efficient building air conditioning.

Read more

The innovation map shows how diverse this principle is in practice: over 130 component activation projects from four countries have already been recorded – from renovated old buildings with milled pipes to new buildings such as apartment buildings, schools and office buildings. Each project has an info box with the most important data, photos and a short description – providing a clear overview of the possible applications of component activation.

The diversity is also evident in the heat supply: heat pump systems, solar thermal energy and other climate-friendly technologies are used. The energy comes from sources such as photovoltaics on roofs and facades or wind energy.

Filter posts
Hide filters
Tags
Apply filter and show results

New building criminal justice center

On the site at the southern Oberwiesenfeld / Leonrodplatz in Munich, a multi-storey building with three inner courtyards was created, in which all are...

Administration building at the power plant Zolling

In the case of the administration building for the E.ON power plant in Zolling, the themes of light and energy were the factors that determined the fo...

Südpack

After a construction period of only two years and with a total investment of 40 million euros, a two-story production and storage hall, a four-story o...

Energon

The office building with up to 420 workplaces is the head of a row of buildings along the Berliner Ring in the "Science Park II" in Ulm. The symmetric...

Südweststrom

On the site of the Tübingen public utility company in the south of the university town, Steimle Architekten realized a new administration building for...

Logistics hall

The building is heated and cooled with a thermally active floor slab. For this purpose there is a reversible heat pump....

Office building EIGNER

At the beginning of 2020, the Nördlingen-based company EIGNER Bauunternehmung GmbH moved into its new office building in the direct vicinity of the bu...

Administration in Beilngries

A new administration building for approx. 150 employees was to be constructed for Schmidt-Seeger GmbH with its Beilngries site. The building is divide...

office building Netter Bau

The new headquarters of Netter Bauart was designed and aligned according to the laws of the harmony theory Feng Shui. The choice of building material ...

dm-Drogerie Headquarters

With the dialogicum, dm drogerie-markt GmbH + Co. KG in Karlsruhe has created a new corporate headquarters that reflects the special characteristics a...

Office building Zapf-Daigfuss

A successful combination of old and new: In Behringersdorf, a district of Schwaig, a new office building was constructed for the KS*, the sand-lime br...

Fiscal office Aachen

The tax office center on Krefelder Straße in Aachen houses a total of five offices. In its internal structure, the 71 x 118 m building is divided into...

Köln Triangle

The Köln Triangle office building is located directly on the Rhine, opposite Cologne Cathedral. The ground plan shape of the 103 meter high tower is a...

50 Hertz

On a once desolate 40-hectare site north of Berlin's main station, a new residential and business district has been created. The corporate headquarter...

Passive house

Passive house in solid construction with concrete core activation and firewood stove: The heat supply is completely with renewable energy....

John Cranko school

The famous John Cranko Ballet School in Stuttgart has been given a new "cross over" building. The three main functional areas, consisting of housing (...

Residential and commercial building Allersberg

Successful renovation and new construction in the middle of the marketplace. The house consists of four residential units and one commercial unit....

Semi-detached house Allersberg

In the case of the 2-family house in Allersberg, the installation of the KS-QUADRO THERM system provides for wall tempering as well as wall cooling in...

model house Bonum

The show house of the company Bonum in Altdorf is a semi-detached house in typical Franconian architecture. The steep gable roof even allows the expan...