Coca-Cola plant
Through environmentally friendly manual dismantling and the optimal synergy of re-use and recycling, €100,000 in sales were generated during the dismantling of the Coca-Cola plant on behalf of the building consortium of eight property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA). For example, 5,000 roof panels from the Coca-Cola plant were made available for reuse on site as thermal insulation in the new building in the Biotope City Quarter. 3,000 m2 of extensive green roofs, i.e. the top soil substrate layer including the plant cover, have also been secured and are ready for use.
Completion of dismantling
2017
Building owner
Building consortium of 8 property developers (including ÖSW, ARWAG, Wiener Heim, GESIBA)
Specialist planning
Project participants
Effect achieved
- 4200 hours of employment / 15 people employed
- 450 tons for re-use
BauKarussell
Other interesting projects from the category Circular economy
Niels Bohr car park
A new mobility hub opened in late 2025 in Brunnshög, a developing district in Lund, southern Sweden. It gives decommissioned industrial components a s...
Book depot Vienna
With the new book depot for the Vienna University Library, the Federal Real Estate Company (BIG) is constructing a central storage facility for severa...
Paul & Rosa
In Schweinfurt, Riedel Bau AG realized the residential and research project Paul & Rosa on an approximately 1,400-square-meter plot in the Hochfel...
Telegraf 7 Office
Vienna's Lehargasse 7, close to the Naschmarkt, is home to the former telephone exchange of the Imperial and Royal Post and Telegraph Directorate. Pos...
Building A – Werkstadt Areal, complete refurbishment
Building A is part of the heritage-listed Werkstadt site in Zürich-Altstetten and underwent comprehensive refurbishment during the second construction...
School Köln-Deutz
The Brügelmannstraße secondary school in Cologne-Deutz is one of the most sustainable schools in Germany. It consists of flexible cluster areas that p...
Future-Oriented Rest Area
Between Vienna and Salzburg, the modernised Roggendorf service station is setting an example for the future of transport infrastructure. Here, Afinag ...
Youth Center Ingersheim
Real-World Laboratory S210: from construction aid to permanent architecture: Repurposing concrete formwork from the Stuttgart 21 project into a local ...
Glass Palace
The second construction project, the former data center of the City of Vienna, at Rathausstrasse 1, was completed for BUWOG in August 2017. In 3,450 o...
Alpenos Headquarter
The new headquarters of Alpenos, located in the Non Valley, is a perfect example of innovative design and sustainability. The project, developed by th...