MHP Arena Stuttgart
The MHP Arena in Stuttgart, home stadium of VfB Stuttgart, was converted between June 2022 and March 2024 for the UEFA European Championship. The focus was on building a new main stand, for which the old stand was demolished. Its concrete was processed and reused as recycled aggregate in the concrete of the new stand. Around 10,000 m³ of recycled concrete were installed in this way.
2024
16.000 m²
Stadion NeckarPark GmbH & Co. KG
Structural engineering: sbp SE
At the nearby Port of Stuttgart, around 3,500 m³ of concrete rubble from the demolition were crushed and processed, keeping transport distances short. As aggregate, the material went into concrete of strength classes C30/37 and C35/45, with the recycled content in the components limited to a maximum of 30 per cent. In addition to the recycled concrete, around 4,500 m³ of conventional concrete were used for the main stand.
The recycled concrete was also used in structurally highly stressed components and in areas with possible groundwater contact, for which the DIN standard has not provided for it so far. The State Office for Building Technology was therefore involved at an early stage, and a case-by-case approval was applied for and granted after six months. Clinker-reduced CEM III/A cement was also used. Compared with conventional concrete, this saved around 800 t of CO2.
With the new main stand, the usable floor area inside grew from around 9,000 to almost 16,000 m². It houses, among other things, the team changing rooms and rooms in which up to nine conferences can take place at the same time. Clay walls and plywood ceilings were installed in the changing room area. After the conversion, the stadium holds 60,058 spectators.
Text: ZAB | Sources: SCHWENK, asp Architekten, German Federal Environment Ministry, Stadion NeckarPark